Skip to content

Create a marking project

A standard marking project brings together the assessment events to mark, the people who mark them and the quality controls that check their work. This page covers creating a project, setting it up, building its marking team, and moving it from one phase to the next. For how a project runs and when results are released, see Standard marking.

Before you start

  • The events must be ready. Each assessment event needs Standard marking project as its Event marking mode, which you choose while the event is in Draft. To be added to a project, it must be in Delivery or Closed, have no test overrides, and not already be in another project.
  • The markers must be able to join. A person can be added to a marking team only if their main role is in Roles allowed into Marking Project. To add a group at once, it needs the group type your site uses for marking teams. See Marking settings.

Create the project

There are two ways to create a project.

From Marking Projects

  1. Select Marking > Marking Projects, then Add Marking Project.
  2. Choose the Assessment Events to mark.
  3. If you chose one event, choose its test under Test(s). With more than one event, Test(s) is disabled and the project includes every test in them.
  4. Enter a Name, and change the Identifier if you want to. Add a Completion date and a Description if you want them.
  5. Choose the Team Mode:
    • Team — "Responses will be assessed and managed by a team to be nominated. Quality controls can be enabled." It's offered when your site has quality controls turned on.
    • Solo — "All responses will be assessed and managed by me. No quality controls."
  6. Choose the Group Type for Marking Centre and Group Type for Marking Teams, and the Group Type for Exam Centres if you use one.
  7. Choose whether to tick Allocate all items to mark to all markers by default, and Mark all items as though they are one. With the second ticked, markers can't choose an item: one Mark More! gives them responses from any item.
  8. Select Save.

The New Marking Project form for 2026 Y9 English Exam with both its events chosen and Test(s) disabled, Team chosen for Team Mode, Marking Centre and Marking Team 1 as the group types, and both checkboxes clear. Badges 2 to 8 mark the field for each step, ending at Save

Insights won't save a project for an example test, or one that combines a paper-based event with other events.

From an assessment event

In the event's Actions menu, select Create Marking Project. Insights creates a standard project for the event straight away, named after it, and opens it.

The option appears only when the event is in Delivery or Closed, isn't a quick marked event, has no test overrides, and isn't already in a project.

The 2026 Year 9 English Exam assessment event in Delivery, with its Actions menu open and Create Marking Project boxed at the bottom of the list

Set up the project

A new project starts at Setup. Its page shows the Workflow state, what the project contains, and these sections. Work through them before you start the project:

The 2026 Y9 English Exam marking project at Setup: the Workflow state with its Change button, the Contains counts, Marking Schedule Status, both assessment events, the test and Team Mode, then the Questions and Marking Team sections and each quality control section, all collapsed

Build the marking team

In Marking Team, you add the people who'll mark, give each a role and seniority, and choose what they mark.

Add markers

Select the pencil icon on Marking Team, then add markers in any of these ways:

  • Add Existing Team — choose a group of the marking team type, select Preview, tick the people you want, then select Add to project
  • Select User — choose one person, then their role and seniority, and select Add
  • QuickAdd Users — the plus icon on the Marking Team heading. It creates new user accounts and adds them to the team. It appears only when your site has it turned on and your role lets you add users.

Give each marker a role and a seniority, then select Save. With Role Seniority Mode set to Automatic, you choose one Marking role/Seniority pair instead. See Marking teams for what roles and seniority do.

The 2026 Y9 English Exam Marking Team with Helen Marsh and Daniel Kwan as Chief Markers at level 0, Grace Okoro and Tom Ashworth as Senior Markers at level 3, and Kate Hill and Ravi Menon as Markers at level 5, all at Initiation

Choose what each marker marks

With Allocate all items to mark to all markers by default ticked, each marker you add can mark every item. To limit a marker to some items, select the work allocation icon in their row. In the window:

  • remove an item with its remove icon, then confirm with Really?
  • add an item by choosing it from Select Question to add, then selecting Add
  • tick Assign same items to all other markers in same marking team to give everyone in the marker's team the same items.

Select Save when you're done. The work allocation summary icon on the Marking Team heading lists every marker's items at once.

A marker with no items can't take part. They stay at Initiation when the project starts.

Choose each role's activities

Team Responsibilites (the screen's spelling), under the team list, sets which activities each marker role takes part in: Standardisation 1 selection, marking and sampling, Standardisation 2 and 3, and main-phase sampling and marking. A standardisation column appears only when the project uses that phase. N/A means the role doesn't have permission for that activity.

The grid starts from your site's defaults. To change it, select its pencil icon, tick or clear the boxes, then select Save.

The project's Team Responsibilites grid: Chief Marker ticked for Standardisation 1 and main-phase sampling and marking, Senior Marker for Standardisation 2 and main-phase sampling and marking, and Marker for Standardisation 3 and main-phase marking, with N/A where the Marker role lacks permission

Start the project

Before you start, check that every marker has items in the work allocation summary. A marker with none stays at Initiation.

When the project is set up, select Change beside Workflow state. At Setup it offers:

  • Commence Standardisation 1 — starts standardisation, if the project uses it
  • Set-up Commence Marking — starts marking without standardisation
  • Set-up Cancel — cancels the project. This can't be undone.

The Change menu at Setup, listing Set-up Cancel, Commence Standardisation 1 and Set-up Commence Marking with their descriptions, with Commence Standardisation 1 boxed

Select the option, then select Confirm.

The confirmation asking whether to Commence Standardisation 1 on the 2026 Y9 English Exam marking project, and saying the status will change to Standardisation1, with Confirm boxed beside Cancel

The markers who take part in the new phase move from Initiation to Marking, and everyone in the team is emailed about the change.

The Marking Team after Standardisation 1 starts: Helen Marsh and Daniel Kwan at Marking, the other four still at Initiation

Move between phases

Change always lists the options for the project's current state:

State Options
Setup Commence Standardisation 1, Set-up Commence Marking, Set-up Cancel
Standardisation 1 Commence Standardisation 2, Commence Standardisation 3, Standardisation 1 Commence Marking, Standardisation 1 Cancel
Standardisation 2 Commence Standardisation 3, Standardisation 2 Commence Marking, Standardisation 2 Cancel
Standardisation 3 Commence Marking, Standardisation 3 Cancel
Marking Finalise, Force Finalise, Cancel
Closed Reopen

Insights refuses a move that the project isn't ready for:

  • A phase the project doesn't use. For example, "Standardisation 1 has been set as 'not in use' in the Marking Project Standardisation 1 Settings."
  • Skipping Standardisation 2. "You have chosen to use Standardisation 2, so you cannot proceed directly to Standardisation 3."
  • Leaving Standardisation 1 too early. Every script chosen in Standardisation 1 needs its scores, a final score from sampling, and enough of each script type for each item's quotas.

Cancelling at any state is final. For finalising, force finalising and reopening, see When results are released.

Settings

Administrators can configure these settings at Marking > Marking Extended Settings, under Marking Project Creation Defaults. They set the values every new project starts with. See Marking settings.

Default Allocate all items to all markers to enabled and Default Mark all items as though they are one to enabled, in New Marking Project Automation — tick the two options on the create form by default.

Team Responsibilites — the activities each role starts with in a new project.

Team Roles — the seniority levels, Role Seniority Mode, the group types, the Marking Project Admin Role, and Roles allowed into Marking Project.

Quality Controls — the quality controls a new project starts with.

On each assessment event, Event marking mode must be Standard marking project. Permission to create projects and change their state is set per role at Settings > Roles.